Recently, the third phase of the Guangzhou Window Business Port project's C Area was completed. So far, the "100" shape of the project has completed the last link, which has become a new shining point embellishing the scenery of the back channel of the Pearl River. As a new landmark in the GBA, the project has a total construction area of about 560,000 square meters, with a planned site area of 167,000 square meters, and is divided into three zones, namely A, B, and C. The project is expected to be completed by the end of this year.
近日,广州之窗商务港三期工程C区完成竣工验收,至此,广州之窗“100”造型完成最后一环,以崭新姿态成为点缀着珠江后航道风景线新的闪光点。作为大湾区新地标,广州之窗商务港项目总建筑面积约56万平方米,规划总用地面积16.7万平方米,分ABC三区建设。
版权及免责声明:凡本网所属版权作品,转载时须获得授权并注明来源“欧洲侨报”,违者本网将保留追究其相关法律责任的权力。凡转载文章,不代表本网观点和立场。版权事宜请联系:0040-751021899。